Fine filtration package for FPSO Pazflor using Bondstrand® Glassfiber Reinforced Epoxy (GRE) pipe
The Pazflor project is located in deepwater, offshore Angola, approx. 40 km east of the DALIA FPSO and 150 km from shore. The project is owned by TOTAL E&P Angola (40%), Esso (20%), BP (16.67%) and Statoil Hydro (23.33%). The project will target development of hydrocarbons in two independent reservoir structures.
Project GRE Headers for Seawater Fine Filtration Units
Client VWS Westgarth Ltd, East Kilbride, Scotland (Head Office)
Operator Total E&P Angola
EPC contractor Deawoo Shipbuilding and Marine Engineering
Location Deepwater Offshore Angola, Block 17
Pipe system Bondstrand 2400 lined pipe and fittings with taper adhesive bonded joints
Joint type Quick Lock adhesive bonded joints,2 inch
Taper/Taper adhesive bonded joints, 3 - 10 inch
Operating conditions Fluid: Sea water
Operating pressure: 16.6 bar (g) minimum rating